The Truck parade started in the morning. .....
More than 10 concrete trucks drove in and out of the site all day. Concrete pump tirelessly completed the slap pouring in 5 hours. Finally we were able to walk on the floors. The slab was perfectly laid with the exact shapes as drawn in the plan. Witnessing the physical layout is always pleasing for your eyes and feet. Waiting time starts now until we have the slap stable enough to take the frames up. After years of waiting and months of preparation and anticipation, we have the house foundation ready.
More than 10 concrete trucks drove in and out of the site all day. Concrete pump tirelessly completed the slap pouring in 5 hours. Finally we were able to walk on the floors. The slab was perfectly laid with the exact shapes as drawn in the plan. Witnessing the physical layout is always pleasing for your eyes and feet. Waiting time starts now until we have the slap stable enough to take the frames up. After years of waiting and months of preparation and anticipation, we have the house foundation ready.













No comments:
Post a Comment